Construction Progress – 10th October 2014

Construction of tOLYMPUS DIGITAL CAMERAhe the concrete foundation is complete, including backfilling and landscaping. Delivery of the cranes and turbine components, and subsequent erection of the wind turbine, are scheduled to take place this coming week (commencing 13/10). Checks have been successfully carried out on crane and delivery vehicle road access, and the load bearing capacity of the crane pad and access track. Arrangements are in place for removing road signs and gOLYMPUS DIGITAL CAMERAate posts. The grid connection is progressing towards completion: the SSE switchgear is now on site, and the 11kV grid cable is currently being laid, with connection date scheduled for 31/10.

OLYMPUS DIGITAL CAMERA   10 RMU and Graeper 8  Landscaping

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s