The Build – 17th October 2014

The building of the turbine took place in mid October, starting the day after delivery. It was all up within 24 hours, except for the rotar blades, which required a still day – which too another week to arrive.  The following are a selection of photographs of the main build.IMG_0954IMG_0999IMG_1022  IMG_1003 IMG_1006 IMG_1014IMG_1026